Over the last month or so, the steading has been dug out as much as it needs to, and some material has been put back in, namely 50 tons of hardcore / crushed rock, and the drainage for the downstairs bathrooms. The main body of the place is on hold a bit while we wait for graite to be delivered. (Should be here in about 6 - 8 weeks) There is a bit of underpinning to be done though, so I won't be twiddling my thumbs.
I won't be twiddling my thumbs anyway, as the base for the garage is complete, and the timber for the garage is arriving on Friday. And I need to turn it from a pile of wood into a set of frames ready to be put up by some willing (and perhaps unwitting, although I hope not) volunteers. By the end of the month.